- 0
- 0
- Days
- 0
- 0
- :
- 0
- 0
- :
- 0
- 0
US $7.97
3%offUS $7.72
6%offUS $7.48
9%offUS $7.23
12%offUS $6.98
15%offAdd to Cart Buy Now
Add to Wish List (1 People Have Added)
I Want Mixed Products
Dyed Natural Long Oval Wood Beads, Oval/Oblong, Lead Free, Light Yellow, 23x8~9mm, Hole: 2.5mm, about 2000pcs/1000g(WOOD-Q003-23x8mm-09-LF)
Comments: Please input your mixed request.
Item Code: Please input the item code.
Comments: Please input your mixed request.
Dyed Natural Long Oval Wood Beads, Oval/Oblong, Lead Free, Light Yellow
Size: about 23mm long, 8~9mm wide, Hole: 2.5mm; about 2000pcs/1000g.
Priced per 1,000 g
Please Note: The color may be slightly different from the picture because of different display device.
Size | 23x8~9mm, Hole: 2.5mm, about 2000pcs/1000g |
Material | Maple Wood |
Color | Light Yellow |
Shape | Oval |
Usage | Beads |
Package Size | 1,000 g per package |
Search by Image
·Search kbeads with an image instead of text. Try dragging an image here.
Uploading File