- 0
- 0
- Days
- 0
- 0
- :
- 0
- 0
- :
- 0
- 0
US $9.44
3%offUS $9.15
6%offUS $8.85
9%offUS $8.56
12%offUS $8.27
15%offAdd to Cart Buy Now
Add to Wish List (8 People Have Added)
I Want Mixed Products
Dyed Natural Long Oval Wood Beads, Oval/Oblong, Lead Free, Mixed Color, 23x8~9mm, Hole: 2.5mm, about 2000pcs/1000g(WOOD-Q003-23x8mm-M-LF)
Comments: Please input your mixed request.
Item Code: Please input the item code.
Comments: Please input your mixed request.
Dyed Natural Long Oval Wood Beads, Oval/Oblong, Lead Free, Mixed Color
Size: about 23mm long, 8~9mm wide, Hole: 2.5mm; about 2000pcs/1000g.
Priced per 1,000 g
Please Note: The color may be slightly different from the picture because of different display device.
Size | 23x8~9mm, Hole: 2.5mm, about 2000pcs/1000g |
Material | Maple Wood |
Color | Mixed Color |
Shape | Oval |
Usage | Beads |
Package Size | 1,000 g per package |
Search by Image
·Search kbeads with an image instead of text. Try dragging an image here.
Uploading File